We installed Polysafe flooring in a science lab of Brockington college in the christmas break 2018. A little bit about the project: We: uplifted and exposed of existing flooring. installed Ardex self levelling compound (smoothing compound), this was to prepare the sub floor. The leveling compound was laid at a 3mm thickness (as standard). installed the new Polysafe flooring to the science lab. The total area was 96m2 and we […]
]In December 2018 we completed our first flooring project East Midlands Airport. Our first project was to supply and fit the following commercial flooring: 305m2 of Heuga carpet tiles throughout new offices 40m2 of Polysafe standard 2.5mm safety flooring to the new toilets 80m2 of Polysafe standard 2.5mm safety flooring to the new kitchenette Working with the main contractor Oliveti Construction, we were very excited about this project and are […]