Latex Screeding & Floor Levelling
Latex screeding and smoothing compounds from Ardex, F.Ball and Mapei, giving a flat, sound base so your new floor looks right and lasts.
A floor is only as good as what is underneath it
Most floor failures start below the surface. Uneven, cracked or contaminated subfloors show through thin finishes like LVT and vinyl and can cause adhesive failure.
We test and assess every subfloor, repair cracks and defects, prime, and apply the right smoothing or levelling compound to give a flat, smooth base ready for the new floor.
Where moisture is a problem, we install a damp proof membrane first.
Why preparation matters
Sectors we work in
Trusted preparation products
Subfloor preparation FAQs
Do I need latex screeding?
If the subfloor is uneven, has joints or is a different material across the area, levelling compound is usually needed, especially under LVT and vinyl. We check at the survey.
How long before flooring can go down?
It depends on the product and thickness. Many compounds can take foot traffic within hours, and we build the drying time into the programme.
Can you level over old adhesive?
Sometimes, but often residue needs removing first. We assess the base and recommend the right approach.
Need your subfloor prepared?
Book a free site survey. We will measure, test the subfloor and send an itemised quote.